Foil RunAlpha
Foil RunCreate account or sign in
WIND 245°

Advanced analysis for your time on foil.

GPS analysis for parawing, wing, and downwind SUP. Unpack your climbs, turns, and runs.

Record with the app

Free to use · Apple Watch needs an iPhone · Garmin works with iPhone and Android

Or bring a GPX or FIT file. Analyze a track

What we measure

Upwind, downwind, and every turn between.

Upwind · parawing, wing, kite

Ground gained upwind. Climb VMG counts the whole climb, turns and all. Sailing VMG keeps only the clean sailing, what your setup can do.

WINDGAINED1.5 km
3.6kn Climb VMG4.2kn Sailing VMG
Downwind · how fast

Your fastest kilometre, 5 km and 10 km, when you ride that far without a break.

RUN · 11.0 km · 32:34FASTEST 1 KM2:46FASTEST 5 KM14:20FASTEST 10 KM29:16
2:46fastest km14:205 km29:1610 km
Downwind · how hard you shred

Shred Score

Learn more ›

Shred Score gives you something to chase besides speed. Link carves, build combos.

weave 3carve 5shred 0×8 linked
4.88Shred Score / min×8longest combo
Turns · everyone

Tacks and gybes

Learn more ›

Speed held through the turn, and ground lost in your climb.

GYBESPEEDHELD101%GROUNDLOST56 mTACKSPEEDHELD87%GROUNDLOST25 m
17 gybes✓17
3 tacks✓1✕2
Share

You sent it. Now send it.

A climb reel mid-film: three clean turns in a row
Climb reel
A run reel mid-film: five linked turns on the run
Run reel
A session reel’s closing card with the ride’s numbers and turn outcomes
Session reel
On the water

Know how you’re going, while you’re going.

See how quickly you’re gaining ground upwind and how far that last wave took you.

Upwind VMG5.8kn11.2 kn speed · 142 bpm
Last wave1:42512 m

Talk gear to me.

Everybody talks about their gear. We take notes. Tell us a bit when you start and end your session, or back at your phone.

“22 and nuking, super lumpy. Gonna send it with my 3m and 690!”
Parawing
Ozone Pocket Rocket V1 3.0 m²
Front foil
Armstrong MA Mk II 690 cm²

The AI knows the catalog and your quiver, so “my 3m and 690” lands as the right sail and the right foil, filed with the ride. A season of that, and the gear debate finally has receipts.

The season

All those sessions add up.

Parawing98 sessions · 72h 22m
Maneuvers
Tacks
56%
All-time clean rate116 clean of 20838 touchdowns · 54 crashes
From port 54%From starboard 58%
Gybes
98%
All-time clean rate731 clean of 7477 touchdowns · 9 crashes
From port 96%From starboard 99%
Downwind runsacross 73 sessions
On foil17h 29min downwind runs
Longest glide35m 40s
Glides209

A little evidence for the gear debate.

Was it the foil, the wing, or just a very good Tuesday? Keep your setup with each ride and start figuring out what works for you.

Upwind VMG · knfaster upwind
Ozone Pocket Rocket V132 sessions · 10.2 h upwind392 spans · 83 climbs
Courses

Friendly rivalry.

Chase your own best. Find your crew on the board. Or take on the whole spot.

UPWIND · FASTEST UP#1 2:29#2 3:50#3 5:04DOWNWIND · SPEED + TURNS×3×5#1 2:26#2 2:32#3 2:48SHRED SCOREUPWIND · FASTEST UP#1 2:29#2 3:50#3 5:04DOWNWIND · SPEED + TURNS×3×5#1 2:26#2 2:32#3 2:48SHRED SCORE
Upwind time adjusts for each climb’s wind, so the board stays fair.Who’s the fastest, and who shreds the hardest?